Conceptual Graphics
Proposed Margaret Hunt Hill Bridge - Model Photographs (above)
![]() |
![]() |
|
![]() ![]() |
||
![]() |
||
Vision Plan - The map above is divided into four sections. Mouse over a section and click on it to view a larger image of that section.
Entire Vision Plan map (Adobe PDF format)
The proposed IH-30 bridge is currently under design . It will rise to 300' at the center arch and will span 1,100 ft. It will have 11 main lanes, 1 reversible HOV lane, and 4 lanes of collector/distributor road. (Click on the graphics above to enlarge.)

A view looking upstream on the Oak Cliff side of the floodway, from the Houston/Jefferson bridges. (Click on the graphic to enlarge.)

A view of the floodway looking upstream from the IH-30 bridge. (Click on the graphic to enlarge.)

A view from the lake, looking over the promenade and the reunion pedestrian gateway. (Click on the graphic to enlarge.)




